Laserfiche WebLink
PmgC 2 o V 3 <br />112c Annual Report <br />Permittee Naive: Rocky Mountain Materials Pcitnit Numbcr: M -1992 -014 <br />& Asp halt, Inc. _ <br />Operation Name: Penrose Ranch's County: Fremont <br />Annual Fee Due: $791.00 Anniversary Date: -lunc_24, 2013 _ <br />Permit Acreage! 2,496.00 1 Current Qond_Amt: lit i 1,283.09 <br />According to CKS. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary dale. oFthC 1)e1 111rt, all operator ~hall su Lim it <br />the Annual Fee, an Annual Report and Map showing the extent of current disiurbanecs to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcorining year, any reclamation that will be performed doting the upcoming year, the <br />dates for the beginning of active operations, and the date Active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and print- to the next compliance <br />inspection of the site. If, while completing this report, you team that your site js not in compliance with the n11es and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1, Is the site identification sign posted in accordance with Rule 3.1.12(1)- ' NO <br />2. is the affected area boundary clearly marked in accordance with Kulc 3.1.12(2). YES No <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is comple(e)? YES NO <br />1F "YES," please note time limits related to completion of reclamation, Rule 3 1.3. <br />4. What was the date orlaA excavation, processing or hauling activity at the mine? J, r L,-.-e <br />S- Does the mine operate more than 180 days per year? 1`E No <br />If "NO ", please review Rule 1,13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY Ck:SSATION Sta(rlti? YFS <br />b) approval for TNTERM I`I TENT OPf kA- rJON? 1' F's 9 <br />7. Nurnber of acres currently affected (mining + incomplete and or unreleased rcclaill;161111) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. _ <br />110. Estimated new acreage to be affected in the next report <br />year. <br />_ _ 12Q <br />11, Estimated acres to be reclaimed in the next report year. <br />2O <br />12. Total acres in Various stages of reclamation, since ermitted mining activities be <br />Total acres <br />�/`� Total acres <br />Total acres <br />Total acres <br />backfilled, <br />Seeded w/ <br />f <br />w /topsoil <br />rnlllched w/ <br />approved rnix: <br />replaced: <br />—,lumroved mulch; <br />Total acres <br />'total acres <br />Topsoil <br />Mulch application — <br />graded: <br />fertilised w/ <br />replacement <br />(e rate (tans /ac): <br />a rvd fertilizer: <br />depth in.): <br />Seed <br />Fertilizer <br />MulLll <br />application <br />method: <br />4 application <br />�i—P <br />� <br />application <br />method: <br />A, j <br />nictlind: <br />zO 'd <br />'ON xdd <br />lad z9:10 AHI E I H -L t -100 <br />