My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-02_PERMIT FILE - C1981019A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2013-10-02_PERMIT FILE - C1981019A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2017 7:48:11 AM
Creation date
10/18/2013 7:53:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/2/2013
Section_Exhibit Name
4.23 Augur and Highwall Mining
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RULE 4 PERFORMANCE STANDARDS <br />4.23.10 Backfill and Grading Requirements <br />Highwall mining will be conducted in accordance with the backfilling and grading requirements of 4.14. <br />4.23.11 Highwall Shall be Eliminated <br />Highwall mining is proposed to occur in areas previously mined with adequate material on hand to <br />backfill the pits with proper static safety factors for stability to the approved postmining topography <br />thereby eliminating all highwalls. Any minimal spoil material generated by the highwall mining <br />operation will be buried at depth in the pit backfill. All coal seams mined will be adequately covered by <br />pit backfilling in conformance with the permitted PMT and reclamation plan. No remnant highwalls will <br />be left at conclusion of the reclamation activities and no spoil material will be place on any outslopes. <br />Rule 4 Performance Standards 4.23-3 Revision Date: 6/23/08 <br />Revision No.: MR-91
The URL can be used to link to this page
Your browser does not support the video tag.