Laserfiche WebLink
7. No response was required. <br />8. Goff has proposed a rip rap bank stabilization design to ensure that runoff from the Upper Carbon <br />Junction Channel is directed to the Carbon Junction Permanent Diversion. This appears to be an <br />appropriate proposal, but the placement (grade and length) should be verified in the field (field fit) <br />to determine whether it extends far enough to ensure that flow is diverted off of the permanent fill <br />and away from the East Diversion Channel. <br />Should you or the operator have any questions or need additional information, please let me know. <br />