1 <br />appears that the rip rap may be larger than designed, however, it is difficult to determine the actual D50 <br />without a proper geotechnical analysis. <br />From TR -11, the permanent diversion was designed to convey the 100 year peak flow of 346 cfs with 0.3 <br />feet of freeboard. A channel roughness coefficient of 0.044 was used. As part of this technical revision, <br />a HEC -RAS analysis was performed to determine the ability of the as -built channel to convey the same <br />100 year design event. The as -built survey topography was used to generate cross sections and <br />channel slope. A channel roughness coefficient of 0.047 was used to simulate the coarser rip rap in the <br />as -built channel. It was determined that the 100 year peak flow would be contained within the as -built <br />channel. The HEC -RAS cross sections with 100 year water surface elevations are shown in Appendix A. <br />' A capacity analysis for the as -built twin 66" CMP culverts was not conducted as part of this technical <br />revision since this was done by Goff Engineering in May 2007. That analysis concluded that the twin 66" <br />' culvert would pass the 100 year design event. The analysis is included in the appendix. <br />IUpper Carbon Junction Channel (Abatement Step #2) <br />' The Channel Improvement Plan, Exhibit C2.0, shows the extents of the reestablishment of the Upper <br />Carbon Junction Channel, This includes the reclamation /removal of the Carbon Junction Temporary <br />Diversion, realignment of approximately 150 LF of the un -named tributary near the historic confluence <br />' with the Upper Carbon Junction Channel and reestablishment of the Upper Carbon Junction channel. <br />The Carbon Junction Temporary Diversion runs along the easterly side of the Upper Carbon Junction <br />' Channel approximately 1400 LF from Sta. 26 +70 to approximate Sta. 36 +00. Reclamation of the <br />temporary diversion consists of removing approximately 630 LF of the existing channel and berm from <br />its current confluence with the Upper Carbon Junction Channel (Sta. 26 +70) upstream to the un -named <br />' tributary (Sta. 33 +00). The existing diversion berm from the un -named tributary upstream to the end of <br />the berm ( =Sta. 36 +00) will be reclaimed /removed as well. <br />' The un -named tributary will be re- routed to its near historic confluence with Upper Carbon Junction <br />Channel at approximate Sta. 31 +60. The new channel is approximately 150 feet long, 3' bottom width <br />and 3' deep. It will be armored with 12" nominal diameter rip rap to prevent erosion. A HydroCAD <br />' analysis was completed to determine the 10 year design flow generated from the un -named tributary <br />basin (Basin 2) and the capacity of the channel re -route (Appendix Q. The 10 year design flow of 23.58 <br />cfs will be contained within the proposed channel cross section. Discharge velocities at the discharge of <br />the re- routed un -named tributary to the Upper Carbon Junction channel are 4.6 fps and should not <br />require additional rip rap at the confluence. <br />At the current confluence of the existing Carbon Junction Temporary Diversion and the Upper Carbon <br />Junction Channel an area of sediment deposition has formed creating a sump condition on the upstream <br />side of the confluence. This portion of the Upper Carbon Junction Channel, approximately 100 LF, will <br />' be regraded to remove the sediment deposition and sump condition, and provide positive drainage <br />along the channel. The regrading work should match the existing channel at the upstream and <br />downstream ends, reestablishing the channel to its' near historic condition. <br />1 <br />