Laserfiche WebLink
MOTOR GRADER WORK <br />Task description: Final grade disturbed areas (not bond released) <br />Permit Action: Phase I/III Bond <br />Release SL -13 and <br />Site: New Horizon Mine PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 009 State <br />Date: 12/18/2012 County <br />User: SLB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 14M <br />Ripper Attachment: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper Operating Cost/Hour: <br />Operator Cost/Hour: <br />Total Unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Colorado <br />Montrose <br />DRMS <br />Page 25 of 156 <br />Abbreviation: None <br />Filename: C008 -009 <br />Horsepower: 259 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Altitude Adj : <br />Job Efficiency: <br />Net Correction: <br />$133.27 <br />468.60 <br />SL -12 Ann: 768.6 disturbed ac less 300 ac Ph II SL -11 <br />Source <br />1.00 (CAT HB) <br />0.90 (1 sh/d, fay.) <br />0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />3.25 mph <br />Heavy blading (0 -6 mph) - 3.25 <br />0 degrees <br />14.00 feet <br />2.00 feet <br />12.00 feet <br />4.7273 acres/hour <br />Site Altitude: 5700 feet <br />4.2545 <br />4.2545 <br />Total job time <br />acres/Hour <br />acres/Hour <br />110.14 <br />acres <br />Hours <br />CIRCES Cost Estimating Software <br />Utilization % <br />$37.98 <br />NA <br />$67.74 <br />100 <br />$0.00 <br />$27.55 <br />NA <br />$133.27 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: <br />Source of estimated acreage: <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />Altitude Adj : <br />Job Efficiency: <br />Net Correction: <br />$133.27 <br />468.60 <br />SL -12 Ann: 768.6 disturbed ac less 300 ac Ph II SL -11 <br />Source <br />1.00 (CAT HB) <br />0.90 (1 sh/d, fay.) <br />0.9000 multiplier <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />3.25 mph <br />Heavy blading (0 -6 mph) - 3.25 <br />0 degrees <br />14.00 feet <br />2.00 feet <br />12.00 feet <br />4.7273 acres/hour <br />Site Altitude: 5700 feet <br />4.2545 <br />4.2545 <br />Total job time <br />acres/Hour <br />acres/Hour <br />110.14 <br />acres <br />Hours <br />CIRCES Cost Estimating Software <br />