Laserfiche WebLink
Page 20 of 156 <br />Task 006 - Support Equipment <br />Task <br />No. <br />Task Description <br />Total <br />Hours <br />D9T - <br />Load <br />Support - <br />$249.42/hr <br />Cost <br />D9T <br />Dump <br />Support - <br />$249.42/hr <br />Cost <br />14M - <br />Road <br />Maint. - <br />$139.95/hr <br />Cost <br />H2O Truck <br />$144.18/hr <br />Cost <br />Total Cost <br />Comments <br />1 <br />Drill /shoot hi hwall <br />83.04 <br />20.76 <br />$5,177.96 <br />$0.00 <br />$0.00 <br />$0.00 <br />$5,177.96 <br />Dozer 25% to prepare drilling area <br />4 <br />Drill /shoot ramp <br />5.59 <br />1.3975 <br />$348.56 <br />$0.00 <br />$0.00 <br />$0.00 <br />$348.56 <br />Dozer 25% to prepare drilling area <br />5 <br />Haul boxcut spoil <br />139.68 <br />1 69.84 <br />$17,419.49 <br />27.936 <br />$6,967.96 <br />69.840 <br />$9,774.11 <br />69.840 <br />$10,069.53 <br />$44,231.10 <br />Dozer 50% load, 20% dump, road <br />maintenance 50% <br />30a <br />Topsoil 20.02 ac Morgan <br />56.82 <br />$0.00 <br />$0.00 <br />28.410 <br />$3,975.98 <br />28.41 <br />$4,096.15 <br />$8,072.13 <br />Road maintenance 50% <br />30b <br />Topsoil 31.68 ac Morgan <br />153.11 <br />$0.00 <br />$0.00 <br />76.555 <br />$10,713.87 <br />76.555 <br />$11,037.70 <br />$21,751.57 <br />Road maintenance 50% <br />30c <br />To soil 54.33 ac Morgan <br />301.24 <br />$0.00 <br />$0.00 <br />150.620 <br />$21,079.27 <br />150.62 <br />$21,716.39 <br />$42,795.66 <br />Road maintenance 50% <br />30d <br />Topsoil 106.8 ac <br />Lloyd/Benson <br />312.35 <br />$0.00 <br />$0.00 <br />156.175 <br />$21,856.69 <br />156.18 <br />$22,517.31 <br />$44,374.00 <br />Road maintenance 50% <br />30e <br />I Topsoil 80 ac WFC /Llo d <br />206.78 <br />$0.00 <br />$0.00 <br />103.390 <br />$14,469.43 <br />103.39 <br />$14,906.77 <br />$29,376.20 <br />Road maintenance 50% <br />30f <br />Topsoil 2.38 ac WFC <br />8.4 <br />$0.00 <br />$0.00 <br />4.200 <br />$587.79 <br />4.2 <br />$605.56 <br />$1,193.35 <br />Road maintenance 50% <br />31 <br />Topsoil 34.6 ac <br />40.68 <br />$0.00 <br />$0.00 <br />20.340 <br />$2,846.58 <br />20.34 <br />$2,932.62 <br />$5,779.20 <br />Road maintenance 50% <br />36a <br />Topsoil 10.17 ac <br />15.24 <br />$0.00 <br />$0.00 <br />7.620 <br />$1,066.42 <br />7.620 <br />$1,098.65 <br />$2,165.07 <br />Road maintenance 50% <br />41 <br />Topsoil 3.99 ac <br />1.84 <br />$0.00 <br />$0.00 <br />0.920 <br />$128.75 <br />0.920 <br />$132.65 <br />$261.40 <br />Road maintenance 50% <br />45 <br />Topsoil BB Detour <br />37.6 <br />$0.00 <br />$0.00 <br />18.800 <br />$2,631.06 <br />18.8 <br />$2,710.58 <br />$5,341.64 <br />Road maintenance 50% <br />46 <br />Topsoil 6.5 ac <br />27.58 <br />$0.00 <br />$0.00 <br />13.790 <br />$1,929.91 <br />13.79 <br />$1,988.24 <br />$3,918.15 <br />Road maintenance 50% <br />49 <br />Topsoil 5.45 ac <br />16.57 <br />$0.00 <br />$0.00 <br />8.285 <br />$1,159.49 <br />8.285 <br />$1,194.53 <br />$2,354.02 <br />Road maintenance 50% <br />50 <br />Topsoil 2.25 ac <br />2.66 <br />$0.00 <br />$0.00 <br />1.330 <br />$186.13 <br />1.33 <br />$191.76 <br />$377.89 <br />Road maintenance 50% <br />82 <br />Haul BB pavement <br />2.06 <br />$0.00 <br />$0.00 <br />1.030 <br />$144.15 <br />1.03 <br />$148.51 <br />$292.65 <br />Road maintenance 50% <br />83 <br />Haul BB fill <br />4.79 <br />$0.00 <br />$0.00 <br />2.395 <br />$335.18 <br />2.395 <br />$345.31 <br />$680.49 <br />Road maintenance 50% <br />92 <br />Compact BB road <br />88.82 <br />$0.00 <br />$0.00 <br />$0.00 <br />22.205 <br />$3,201.52 <br />$3,201.52 <br />Water truck 25% <br />93 <br />Compact 2700 road <br />34.02 <br />$0.00 <br />$0.00 <br />$0.00 <br />8.505 <br />$1,226.25 <br />$1,226.25 <br />Water truck 25% <br />1538.9 <br />91.998 <br />$22,946.02 <br />27.936 <br />$6,967.96 <br />663.7 <br />$92,884.82 <br />694.41 <br />$100,120.03 <br />$222,918.83 <br />CIRCES Cost Estimating Software <br />