Laserfiche WebLink
BULLDOZER WORK <br />Task description: Grade spoil side material and coal stockpile into pit <br />Permit Action: Phase I/III Bond <br />Release SL -13 and <br />Site: New Horizon Mine PR -6 Permit/Job #: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 003 State <br />Date: 12/18/2012 County <br />User: SLB <br />Colorado <br />Montrose <br />Abbreviation: None <br />Filename: C008 -003 <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9U <br />Horsepower: <br />405 <br />Blade Type: <br />Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $498.84 <br />MATERIAL QUANTITIES <br />Initial Volume: 478,169 <br />Swell factor: 1.000 <br />Loose volume: 478,169 LCY <br />Source of estimated volume: WFC Fence Diagram, 3,348' long Cut 96 + 4,000 Icy <br />coal <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-20% <br />200 feet <br />737.1 LCY/hr <br />Partly consolidated stockpile 1.1 <br />5,700 feet <br />2.900 lbs /LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $498.84 <br />MATERIAL QUANTITIES <br />Initial Volume: 478,169 <br />Swell factor: 1.000 <br />Loose volume: 478,169 LCY <br />Source of estimated volume: WFC Fence Diagram, 3,348' long Cut 96 + 4,000 Icy <br />coal <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />-20% <br />200 feet <br />737.1 LCY/hr <br />Partly consolidated stockpile 1.1 <br />5,700 feet <br />2.900 lbs /LCY <br />Decomposed rock - 50% Rock, 50% Earth <br />