Laserfiche WebLink
place? If so, please provide a copy of this plan in the EPP. Are the results of any current stability <br />monitoring recorded and available for review? <br />- There is no mention of phreatic surface monitoring, inclinometers or any structural monument <br />surveys of these tailings dams in the EPP at this time. If this type of stability monitoring is not <br />currently being conducted, this topic will need to be addressed by Climax before full scale <br />mining and processing resumes. Climax will need to commit to submitting, and receiving DRMS <br />approval, of a TSF Design, Operations and Monitoring Plan before these facilities are further <br />enlarged. The TSF plan and the annual report should include at least annual stability <br />monitoring /certification by a qualified engineer as well as the design and QA /QC plans for <br />TSFs. <br />Response: The attached TR -23 documents provide design, stability, operations and monitoring <br />information for the Mayflower and Tenmile TSFs. The Operations and Maintenance Manuals <br />will be incorporated into the EPP by reference. <br />Thank you for your review and consideration of the TR -23 documents. Please feel free to <br />contact me at 719 - 486 -7584 if you need any additional information. <br />Sincerely, <br />Raymond Lazuk <br />Environmental Manager <br />enclosures <br />3 <br />