Laserfiche WebLink
Climax M6-1 bdenum Climax Mine <br />y Hwy. 91 — Fremont Pass <br />Climax, CO 80429 <br />A Freeport- McMoRan Company Phone (719) 486 -2150 <br />Fax (719) 486 -2251 <br />Sent by Certified Mail v <br />October 10, 2013 <br />Mr. Eric Scott <br />/Environmental Protection Specialist <br />Colorado Division of Reclamation Mining and Safety <br />1313 Sherman Street; Room 215 <br />Denver, CO 80203 <br />Re: Technical Revision #023; Mayflower Tailing Storage Facility Design, Stability and <br />Operations and Monitoring Plans, and Modifications to Tenmile Tailing Storage <br />Facility Operations and Monitoring Manual, Permit #M -7493 - Climax <br />Molybdenum Company, Climax Mine <br />Dear Mr. Scott: <br />This letter is to request Technical Revision #023 (TR -23) to the Climax Mine Reclamation <br />Permit (M -77 -493) regarding the design, stability, and operations and monitoring for the <br />Mayflower Tailing Storage Facility (TSF), and modifications to the Tenmile TSF Operations and <br />Monitoring Manual submitted previously as TR -20. TR -23 is intended to satisfy DRMS <br />regulatory requirements with regards to DRMS Rule 6. 5 and Rule 7.3, and provides additional <br />information on the Mayflower TSF as discussed in the March 1, 2011 letter from Climax to <br />DRMS responding to the November 10, 2010 AM -06 adequacy determination letter as well as <br />the December 15, 2011 Climax response to the September 9, 2011 DRMS adequacy review letter <br />for TR -18. The Mayflower TSF Operations and Maintenance Manual, and modifications to the <br />Tenmile TSF Operations and Maintenance Manual will be incorporated in the Environmental <br />Protection Plan (EPP) by reference. <br />Technical Revision #023 consists of three documents included in the CD with this letter: <br />• Operations and Maintenance Manual - MayflowerTailing Storage Facility and 5 Dam <br />• Mayflower Tailing Storage Facility 5 Dam Operating Condition Seepage and Stability <br />Analyses <br />• Revised Operations and Maintenance Manual - Tenmile Tailing Storage Facility and 3 <br />Dam <br />Enclosed are electronic files of the TR -23 documents and the $1,006.00 fee applicable to a 112d <br />operation. We will mail you two hard copies of Mayflower reports and one hard copy of <br />Tenmile replacement pages within the next few days. Specific DRMS comments in the <br />November 10, 2010 DRMS adequacy determination letter for AM -06 addressed by TR -23 are as <br />follows: <br />RECEIVED <br />OCT 15 2013 <br />Division of Reclamation, <br />Mining & Safety <br />