My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-15_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-10-15_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:56 PM
Creation date
10/15/2013 12:32:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/15/2013
Doc Name
Adequacy Review Letter and RCE
From
Jerry Nettleton
To
DRMS
Type & Sequence
MR267
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/15/13 State.co.us Executive Branch Mail - Fwd: Foi del Creek Mine, MR-267, Adequacy Review Letter and RCE <br />W <br />"A U <br />From: Musick - DNR, Jason [mailto:jason.musick@state.co.us] <br />Sent: Tuesday, October 15, 2013 9:53 AM <br />To: Nettleton, Jerry <br />Subject: Re: Foidel Creek Mine, MR-267, Adequacy Review Letter and RCE <br />Thanks Jerry - One thing that I need to ask associated with MR267 that I probably should have mentioned in the <br />adequacy is any DWR permits applied for with this revision. In the past DWR did not require permits if <br />associated with Coal Mining; however, due to change in policy they now are. <br />Thanks, <br />Jason <br />On Tue, Oct 15, 2013 at 9:26 AM, Nettleton, Jerry <JNettIeton@peabodyenergy.com> wrote: <br />105111M <br />Attached is a scanned copy of the Metcalf Cultural Resource Survey Report (for insertion in the Cultural <br />Resource Exhibit in the Confidential Permit Volume). You will note that they found lithic scatter and a <br />possible campsite along the access road to the 22-Right borehole. Given that the road at this location is <br />undeveloped two-track, we are checking and will verify that we can route around the identified CR area, <br />and thereby avoid any disturbance. I <br />I reviewed the your bond estimate, and am comfortable with accepting your calculations as the basis for <br />bonding this revision. <br />I talked with the CPWT&E Specialist this morning, and he has forwarded the consultation letter to the <br />CPW Area Manager for review and approval, so I should be seeing the letter in the next couple days, and <br />will forward a copy to you on receipt. <br />Thanks for your cooperation and assistance in processing this revision application quickly. We are still <br />hoping to get the work done before we get significant snow. Also, thanks for your cooperation and <br />assistance throughout the Permit Renewal review process. It's good to have that behind us — <br />hftps://mail.gc)ogle.conVmai1/u/O/?ui=2&ik--e29129fcb5&view --pt&search=inboy&th=141bcf57lc6lc7le 2/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.