Laserfiche WebLink
10/15/13 State.co.us Executive Branch Mail - Fwd: Southfield Mine: MWNW & Pond 4 <br />program. The plan shall include, at a minimum, all information <br />required under the relevant sections of Rule 2. <br />(2) Each plan shall contain the following information for the proposed <br />permit area, including any roads which are to be removed, or modified <br />for retention as part of the post - mining land use: <br />(a) A detailed timetable for the completion of each major step in the <br />reclamation plan; <br />(b) A detailed estimate of the cost of reclamation of the proposed <br />operations required to be covered by a performance bond with <br />supporting calculations for the estimates; <br />(c) A plan for backfilling, soil stabilizing, compacting, and grading <br />with postmining contour maps and appropriate cross sections that <br />are typical and representative of the anticipated character of the <br />final surface configuration of the proposed permit area, in <br />accordance with 4.14, for stream channel reconstruction in <br />accordance with 4.05.4, and for road removal or modification in <br />accordance with 4.03. <br />2.05.5 Postmining Land Uses. <br />(1) Surface coal mining activities. <br />I I I (1)(b), <br />(a) Each plan shall contain a detailed narrative of the proposed use, <br />following reclamation of the land within the proposed permit area. <br />In accordance with land use categories established in the narrative, <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th =141 bcef852l d94a5 8/20 <br />