My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-14_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2013-10-14_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:35 PM
Creation date
10/15/2013 11:04:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/14/2013
Doc Name
Paula Coulter objection to Division Proposed Decision
From
Paula Coulter
To
DRMS
Type & Sequence
TR40
Email Name
JHB
RDZ
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/15/13 State.co.us Executive Branch Mail - Fwd: Southfield Mine: MWNW & Pond 4 <br />will also detail our opinion regarding Pond 4 and additionally address our thoughts on all of the <br />existing wells on <br />our property. <br />MWNW: <br />In the report conducted by the Colorado Division of Minerals and Geology, Ronald W. Cattany, <br />Director and James R. Stark, Environmental Protection Specialist : Findings of Compliance <br />and Proposed Decision for a Phase 1 Bond Release and Bond Reduction SL -02 for Energy <br />Fuels Coal, Inc.. Southfield Mine, Permit No. C -81 -014 <br />please refer to the Section: Sealing of Underground Mine Openings- Portals, Fans, Vent Shafts <br />and Monitoring Wells and specifically page16 which states: <br />"None of the five monitoring wells within the Southfield permit area have been sealed <br />at this time. All are required for ongoing hydrologic monitoring of the groundwater. The <br />Division has also requested that EFCI leave the North Dewatering Well open to monitor <br />water inflows into the mine and to monitor water quality in the mine." <br />From the Colorado Division of Minerals and Geology :GUIDLINE REGARDING SELECTED <br />COAL MINE BOND RELEASE ISSUES: <br />"The Phase 111 bond release application must include a detailed water quantity and quality <br />impact analysis to assess compliance with 4.05. This analysis will provide a summary of <br />existing surface and groundveter data for the mine and adjacent areas. Adequate <br />monitoring facilities must remain in place and functional through the bond liability <br />period to ensure that this requirement can be met." <br />Further, <br />"Accordingly, impact analysis will focus on trends which would support or refute <br />long -term stability in quantity and quality data. Bond release might be delayed if the <br />surface or groundwater quality data indicate trends towards hydrologic balance <br />degradation". <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th =141 bcef852l d94a5 2/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.