My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-14_REVISION - C1981014
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981014
>
2013-10-14_REVISION - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:35 PM
Creation date
10/15/2013 11:04:38 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Revision
Doc Date
10/14/2013
Doc Name
Paula Coulter objection to Division Proposed Decision
From
Paula Coulter
To
DRMS
Type & Sequence
TR40
Email Name
JHB
RDZ
MPB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/15/13 State.co.us Executive Branch Mail - Fwd: Southfield Mine: MWNW & Pond 4 <br />Page 109 <br />Section 2.05.5 <br />shall include a discussion of the utility and capacity of the <br />reclaimed land to support a variety of uses and the relationship of <br />the proposed use to existing land use policies and plans. The <br />description shall explain: <br />(i) How the proposed postmining land use is to be achieved and <br />the necessary support activities which may be needed to <br />achieve the proposed land use; <br />(ii) Where a land use different from the premining land use is <br />proposed, all materials needed for approval of the alternative <br />use under 4.16; and <br />(iii) The consideration which has been given to making all of the <br />proposed surface mining activities consistent with surface <br />owner plans and applicable State and local land use plans <br />and programs. <br />(b) The description shall be accompanied by a copy of the comments <br />concerning the proposed use by the legal or equitable owner of <br />record of the surface of the proposed permit area and the State and <br />local government agencies which would have to initiate, <br />implement, approve, or authorize the use of the land following <br />reclamation. <br />(c) A map prepared to the standards of 2.10 shall accompany the plan. <br />(d) For those disturbed areas within the permit area where long term <br />structures or facilities exist or are to be constructed, the applicant <br />https: / /mail.g oog le.conVmai I /u /0 / ?ui =2 &i Ire29129fcb5 &view = pt &search =i nbox&th =141 bcef852l d94a5 10/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.