My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-15_HYDROLOGY - C1981014
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981014
>
2013-10-15_HYDROLOGY - C1981014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:43 PM
Creation date
10/15/2013 10:33:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014
IBM Index Class Name
Hydrology
Doc Date
10/15/2013
Doc Name
Pond 4 Status
From
Rob Zuber
To
Janet Binns
Type & Sequence
TR40
Permit Index Doc Type
Other Surface Water
Email Name
JHB
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/15/13 State.co.us Executive Branch Mail -Re: Southfield Mine: MWNW & Pond 4 <br />(iv) A plan based on the probable hydrologic consequences <br />determination and baseline hydrologic and geologic <br />information submitted to comply with 2.04.5, 2.04.6, and <br />2.04.7 for the collection, recording, and reporting of ground <br />and surface water quality and quantity data. The plan, in <br />accordance with 4.05.13, shall identify monitoring site <br />locations, points of compliance, parameters, sampling <br />frequency, and describe how these data will be used to <br />determine the impact on the hydrologic balance. At a <br />minimum, the hydrologic monitoring plan shall include: <br />(A) Monitoring of at least total dissolved solids or <br />electrical conductivity corrected to 25 <br />N centigrade <br />(specific conductance), pH, manganese and iron; <br />(B) Monitoring of water levels, reported as feet above or <br />below land surface datum, for ground water plans; <br />(C) M onitoring of total s us pe nde d s olids and flow rate <br />measurements for surface water plans; and <br />(D) Monitoring for additional water quality constituents <br />may be required by the Division based upon sitespecific <br />conditions, approved postmining land use, or <br />for good cause shown. <br />(v) A hydrologic reclamation plan specifically addressing any <br />potential adverse hydrologic consequences identified in the <br />probable hydrologic consequences determination prepared <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &viev�-- pt &search =i nbox&th =141 bcb36ff3ec945 14/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.