My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-07_REVISION - C1996083 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-10-07_REVISION - C1996083 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:14 PM
Creation date
10/10/2013 10:04:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/7/2013
Doc Name
Adequacy Response #1
From
J.E. Stover & Associates, Inc.
To
DRMS
Type & Sequence
TR82
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Susan Burgmaier -2- October 4, 2013 <br />4. DRMS: The last sentence of revised page 2.03 -2, following the Bowie No. 1 <br />Mine information, indicates that BRL and /or its owners and controllers "do not own <br />or control any surface coal mining operation in any state in the United States ". It <br />appears that BRL should state that "That the applicant... does not own or control <br />any othersurface coal mining operation..." Please verify the statement on <br />page 2.03 -5 under 2.03.4(4)(a -b) and revise as necessary. <br />BOW2: Please see revised page 2.03 -2. <br />5. DRM : It would appear that revised page 2.03 -35 should no longer be <br />part of the permit application package, since Cedars Energy, LLC is not the <br />immediate owner or controller of BRL. Please verify whether page 2.05 -35 <br />should be omitted and revise the application as necessary. <br />BOW2: Please remove page 2.03 -35 from the permit package. <br />The ownership and control information provided by BRL was used to update the <br />Applicant Violator System (AVS), and no issues or concerns were identified. <br />BOW2: After this revision was submitted, updated information on the Cedars <br />Corporate Structure was received. Please see revised pages 2.03 -27 and 2.03 -31. <br />Please let me know if you have any questions. Thanks. <br />Sincerely, <br />Tamme Bishop, P.E. <br />Project Engineer <br />Cc: Bill Bear <br />Enclosures: <br />Volume I: Pages 2.03 -2, 2.03 -27, 2.03 -31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.