My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-07_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-10-07_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:14 PM
Creation date
10/10/2013 10:04:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
10/7/2013
Doc Name
Letter & Application
From
J.E. Stover & Associates, Inc.
To
DRMS
Type & Sequence
MR141
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7T" STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX: (970) 242 -7908 <br />MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />October 4, 2013 <br />Susan Burgmaier RECEIVED <br />Division of Reclamation, Mining & Safety OCT 0 7 2013 <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -141, Designated Coal Mine Waste Drying Area, Gob Pile #3, <br />Revise disturbed area boundary <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />On behalf of Bowie Resources, LLC, enclosed is an application for a minor revision to <br />designate a coal mine waste drying area for gob pile #3, and revise the disturbed area <br />boundary in order to allow for increased stockpiling of coverfill materials. <br />Gob will be hauled to both gob piles #2 and #3 during the winter months, with the <br />majority of gob being hauled to gob pile #3. In the reclamation estimate, item 037 <br />accounts for 200,000 cy of un- compacted gob to be in stockpile. This number should <br />be adequate to account for the un- compacted gob that could be in stockpile over the <br />winter months. <br />The disturbed area boundary will be revised to reflect on the ground conditions and to <br />plan for stockpiling operations. As originally permitted, the coverfill stockpile was to be <br />situated in a hay field at the east end of the planned disturbance. However, Bowie has <br />committed to the adjacent landowner, Bob Barnes, not disturb the hay field at this time. <br />So the disturbed area boundary will be reduced in that area. To increase the area <br />available for coverfill stockpile, the disturbed area will be extended to the north as <br />shown on page 4c. In addition, there is an area on the west side of the disturbance <br />that was excluded from the disturbed area boundary that will now be included in the <br />disturbed area boundary. There will be a net decrease of 0.01 acres for the disturbed <br />area boundary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.