Laserfiche WebLink
Stipulation No. 64: was attached to the permit through TR-67, approved on November <br />13, 2009. Twentymile Coal is approved to construct the Refuse Disposal Area <br />Expansion in accordance with designs approved in Technical Revision No. 67. <br />Twentymile Coal Company requested to provide bond for the increased disturbance <br />area in three increments. The first increment, “Initial Bonded Disturbance” of 50.0 <br />acres, is limited to construction of 30.3 acres of refuse pile expansion, 2.4 acres of haul <br />road corridor, 5.9 acres of unclassified stockpile, 3.5 acres of topsoil stockpile, .04 <br />acres of stockpile haul corridors, and 7.5 acres of construction of RDA10 and RDA11 <br />ditches, as shown on Map C-102 (11/13/2009). Prior to disturbance of the Refuse <br />Disposal Disturbance, Twentymile Coal is required to submit additional bond adequate <br />for disturbances associated with bonding increments I and II. No disturbance <br />associated with bonding increments I and II shall occur prior to submittal and Division <br />approval of additional bond. <br /> <br />The current progress of the RDA Expansion does not extend beyond the originally <br />delineated Phase I area. TC will begin the extension of the underdrain and construct <br />additional temporary perimeter collection ditches in conjunction with the initiation of <br />Phase II of the RDA Expansion. Phase II will involve an additional 30 acres of <br />disturbance for the Phase II footprint and soil removal buffer zone. All bonding costs <br />associated with the Phase II expansion have been incorporated in the RN-06 cost <br />estimate. The information associated with Stipulation No. 64 has been incorporated <br />into the PAP. <br /> <br />IX. Coal Mine Waste – Rule 4.11 <br /> <br />The Coal Mine Waste Fire Fighting Plan is found in Exhibit 25a of the permit (4.11.1). <br /> <br />Twentymile Coal Company has previously been approved to dispose of select non- <br />coal waste in a location south of the Area 1 pit. This location is located in spoil <br />material from the Energy Mine No. 1, and is located above the water table (4.11.4(1)- <br />(3)). In addition, coarse coal processing waste is placed in the coal mine waste bank. <br /> <br />Coal processing waste fines are placed in the coal mine waste bank or returned <br />(thickener underflow) to abandoned workings in the Southwest Mining District or <br />Eastern Mining District. <br />No coal mine wastes are stored at the Fish Creek Tipple (4.11.3). <br /> <br />X. Backfilling and Grading <br /> <br />The Foidel Creek mine portals are located along Foidel Creek, faced-up in the <br />highwall from the adjacent surface mining activity in Eckman Park. Partial backfilling <br />and grading was done to help seal the portal area from groundwater inflow. The <br />remaining backfilling and grading will occur at the completion of mining activity at <br />the Foidel Creek mine. No specific approvals are granted under this section. <br /> <br /> <br /> <br /> <br /> <br />29 <br /> <br /> Foidel Creek MineOctober 8, 2013 <br /> <br />