My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-08_REVISION - C1982056 (22)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-10-08_REVISION - C1982056 (22)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:23 PM
Creation date
10/9/2013 1:27:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/8/2013
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
RN6
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bond Releases: <br /> <br />Revision No. Approval date Nature of revision <br /> <br />SL01 7/29/2013 Phase I Bond Release Associated with the CYCC building, <br /> the EMD and 18-Right Shaft installations, and the Fish <br /> Creek Tipple Facilities and Middle Creek Soil Stockpile <br /> Totaling 14.3 acres. <br /> <br />Notice of Violations <br /> <br />Notices of Violations which have been made to the Foidel Creek Mine permit since the last <br />renewal (RN05) are listed below. <br /> <br /> <br />Violation No. CV-2011-005:FAILURE TO PLACE ALL UNDERGROUND DEVELOPMENT <br />WASTE IN EXISTING DISPOSAL AREAS APPROVED BY THE DIVISION WITHIN THE <br />PERMIT AREA. FAILURE TO DISPOSE OF NONCOAL WASTES IN A STATE <br />APPROVED DISPOSAL SITE OPERATED IN ACCORDANCE WITH LOCAL, STATE <br />AND FEDERAL REQUIREMENTS. FAILURE TO CONDUCT ALL SURFACE COAL <br />MINING AND RECLAMATION OPERATIONS ONLY AS DESCRIBED IN THE <br />APPROVED APPLICATION. FAILURE TO COMPLY WITH THE TERMS AND <br />CONDITIONS OF THE PERMIT, ALL APPLICABLE PERFORMANCE STANDARDS OF <br />THE ACT, AND THE REQUIREMENTS OF THE RULES. <br /> <br />Status: This NOV was issued on August 18, 2011 and terminated on October 19, 2011. <br /> <br />Surface Reclamation <br /> <br />Upon cessation of mining activities, all surface disturbances will be reclaimed. Surface facilities <br />will be removed. The portal area, Area 2 pit and the waste disposal site will be backfilled with <br />previously mined spoils existing within areas adjoining the old Energy No. 1 pit. All surface <br />disturbances will be regraded to approximate original contour. Topsoil from existing and <br />proposed topsoil stockpiles will be redistributed over the entire disturbed area to depths 0.7 feet <br />to 0.8 feet as depicted on Map 29 of the permit application, with the exception of those piles <br />which are dedicated to specific areas from which it was removed. Re-seeding and revegetation <br />will occur following topsoil laydown operations. Reclamation success will be determined by <br />statistically comparing the reclaimed areas to reference areas, except at the Fish Creek Tipple, <br />which was constructed prior to implementation of the current laws and regulations. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />15 <br /> <br /> Foidel Creek MineOctober 8, 2013 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.