Laserfiche WebLink
Mr. Ary and Ms. Bellantoni <br />Page 2 <br />October 7, 2013 <br />The following items must be addressed by the applicant in order to satisfy the requirements <br />of C.R.S. 34- 32.5 -101 et seq. and the Mineral Rules and Regulations of the Mined Land <br />Reclamation Board: <br />APPLICATION <br />This application form is adequate as submitted. <br />6.4 SPECIFIC EXHIBIT REQUIREMENTS — REGULAR 112 OPERATIONS <br />Rule 1.10.1(1) includes a provision that the Applicant is not required to submit exhibits <br />as part of an amendment application that have not changed or would present new <br />information with respect to the original application, or previous amendments. Item 16 on <br />page 4 of the amendment application states only Exhibits C, D, E and F need to be <br />updated and have been submitted. The discussion indicates the remaining Exhibits A, B, <br />G, H, I, J, K, M, N, O, P, Q, R and S are consistent with the approved application. The <br />Division concurs that Exhibits A, B, H, I, J, K and P likely won't require updates for this <br />amendment application. However, we believe Exhibits G, L, M, N, O, Q and R require <br />clarification, if not updates. The comments below are therefore limited to Exhibits C, D, <br />E, F, G, L, M, N, O, Q, R and S. <br />6.4.3 EXHIBIT C - Pre - mining and Mining Plan Map(s) of Affected Lands <br />1. Rule 6.4.3(a) requires adjoining surface owners of record be labeled on submitted maps. <br />Based on the comparison of information presented in Exhibit F and the information <br />shown on Exhibit C in the approved application, at least some of the land owners have <br />changed since the permit was originally approved. Please include updated surface <br />owners on Exhibit C. <br />2. Pursuant to Rule 6.4.3(c), the mine plan map should show the existing topography of the <br />area with contour lines of sufficient detail to portray the direction and rate of slope of the <br />affected land. As a minimum, please include contour lines for areas not yet disturbed as <br />part of the mining process for comparison with the contours on the Reclamation Plan <br />Map, Exhibit F. <br />3. Rule 6.4.3(f) requires water information in conjunction with Exhibit G. The current <br />substitute water supply plan approved by the Colorado Division of Water Resources <br />limits groundwater exposure to: "5 acres of pond area, 0.3 acre of dewatering trenches, <br />0.1 acre of collection area, and 0.1 acre of return trench" for a total of 5.5 acres of <br />exposed ground water. In conjunction with information to be provided in an updated <br />Exhibit G requested in Comment #17, please explain how the Operator intends to limit <br />the exposed groundwater to 5.5 acres both during interim operations and final <br />reclamation. <br />4. Parcel 6 is not labeled on Exhibit C, Mine Plan Map as it is on Exhibit F, Reclamation <br />Plan Map. Please use consistent labeling for phases and Parcels of both Exhibits. <br />5. Arrows are shown only in Phase II pointing from west to east in the submitted Exhibit C <br />Mine Plan Map as prepared by ASI. The Phase II area is shaded green. No explanation <br />is provided for either of these features. Please include a legend explaining these two <br />