Laserfiche WebLink
BULLDOZER WORK <br />Task description: Replace Topsoil on Drill Pads and Mud Pits <br />Site: Foidel Creek Mine Permit Action: MR267 Permit/Job #: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 10/7/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi- Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C056 -003 <br />Total unit Cost/Hour: $204.45 <br />Total Fleet Cost/Hour: $204.45 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost /Hour: <br />$63.00 <br />NA <br />Operating Cost/Hour: <br />$104.03 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $204.45 <br />Total Fleet Cost/Hour: $204.45 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />774 <br />Swell factor: <br />1.000 <br />Loose volume: <br />774 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 50 feet <br />Unadjusted hourly production: 1,400.0 LCY/hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 0 % <br />Average site altitude: 6,800 feet <br />Material weight: 2,550 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.900 (AB.AVG.) <br />Material consistency: 1.200 (CAT HB) <br />Dozing method: 1.000 (GEN.) <br />