My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-08_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-10-08_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:22 PM
Creation date
10/8/2013 8:58:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/8/2013
Doc Name
Adequacy Review and Cost Estimate
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
MR267
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 10 <br />BULLDOZER WORK <br />Task description: Backfill and Regrade Mud Pits <br />Site: Foidel Creek Mine Permit Action: MR267 Permit/Job #: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 10/7/2013 <br />User: JDM <br />State: <br />County: <br />Colorado <br />Routt <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D8T - 8SU <br />Horsepower: <br />310 <br />Blade Type: <br />Semi- Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Utilization % <br />$63.00 NA <br />$104.03 100 <br />$0.00 0 <br />$37.41 NA <br />$204.45 <br />$204.45 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,161 <br />Swell factor: 1.125 <br />Loose volume: 1,306 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />50 feet <br />1,400.0 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,800 feet <br />2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Abbreviation: None <br />Filename: C056 -002 <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.900 <br />(AB.AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />Visibility: 1.000 <br />(AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.