My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-08_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2013-10-08_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:22 PM
Creation date
10/8/2013 8:58:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Revision
Doc Date
10/8/2013
Doc Name
Adequacy Review and Cost Estimate
From
DRMS
To
Twentymile Coal, LLC
Type & Sequence
MR267
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Summary of Reclamation Tasks <br />Site: Foidel Creek Mine Permit Action: MR267 Permit/Job #: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 10/7/2013 County: Routt <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />Seal and Abandon 22RT and 19RT Monitoring <br />Wells <br />BOREHOLE <br />1 <br />1 <br />1 <br />1 <br />24.00 <br />$10,492.84 <br />$420.23 <br />$199.70 <br />$396.32 <br />Backfill and Regrade Mud Pits <br />DOZER <br />2.06 <br />Replace Topsoil on Drill Pads and Mud Pits <br />DOZER <br />0.98 <br />Reseed .48 acres disturbance <br />REVEGE <br />2.00 <br />SUBTOTALS: <br />29.04 <br />$11,509.09 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and /or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$232.48 <br />$120.85 <br />$0.00 <br />$1,150.91 <br />$1,504.24 <br />$13,013.33 <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />0.00% <br />Total = $0.00 <br />Reclamation management and /or administration: <br />0.00% <br />$0.00 <br />CONTINGENCY: <br />0.00 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,504.24 <br />TOTAL BOND AMOUNT (direct + indirect) = $13,013.33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.