Laserfiche WebLink
BULLDOZER WORK <br />Task description: APPLY 12 INCHES OF TOPSOIL <br />Permit Action: SO approval warranty <br />Site: Jemadojin Sand Mine calculation <br />PROJECT IDENTIFICATION <br />Page 1 of 2 <br />Permit/Job #: M2006017 <br />Task #: 002 State: Colorado_ Abbreviation: None <br />Date: 2/8/2013 County: El Paso Filename: M017 -002 <br />User: BMK —_ - -- <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8U <br />_ <br />Horsepower: 310 <br />Blade Type: Universal <br />Attachment: 1 -shank ripper <br />Shift Basis: _ 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost /Hour: $63.92 <br />NA_ <br />Operating Cost/Hour: $107.93 <br />_ <br />100 <br />Ripper op. Cost/Hour: $9.35 <br />_ <br />Operator Cost/Hour: $38.85 <br />NA <br />Total unit Cost/Hour: $220.06 <br />Total Fleet Cost/Hour: $440.12 <br />MATERIAL QUANTITIES <br />Initial Volume: 16,133 _ <br />Swell factor: 1.000 <br />Loose volume: 16,133 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />250 feet <br />400.0 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: 5% _ <br />Average site altitude: 4,100 feet <br />Material weight: 1,600lbs/LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: _ 0.750 <br />Material consistency: 1.200 _ (CAT HB) <br />CIRCES Cost Estimating Software <br />