Laserfiche WebLink
3 <br />October 1, 2013 <br />2.4 Placement and Compaction of Fill Materials <br />Material was placed on the fill this quarter. The fill material was placed by Komatsu 830E -AC haul <br />trucks. Dump areas were limited to 50' in height, in accordance with the approved design, though 25' to <br />35' lifts were the typical dump height for all lifts during the quarter. GPS equipped dozers were used to <br />knock down truck placed spoils, assuring construction consistent with the approved design. <br />The fill placement during this quarter was consistent with the approved design, and prudent <br />construction methods As fill material is placed above a previous dump level, the surface of the previous <br />dump is ripped with a D -10 dozer to prevent the formation of perched water tables. Photograph 5 <br />depicts the west facing slope of the fill in the area where the slope of the fill is at 3H:1V. <br />At the end of the third quarter of 2013, the north half of the dump was at the 7600' through 7630' <br />levels. On the south half of the fill was at the 7600' through the 7740'elevation. <br />'. <br />Moor Ve <br />y. <br />2.5 Revegetation <br />Photograph 5: Fill 314:IV Face Looking East (9125113) <br />5 <br />