Laserfiche WebLink
October 1, 2013 <br />Horse Gulch Fill Quarterly Inspection Report <br />Third Quarter 2013 <br />3.0 References <br />I certify that this report was prepared by me. <br />ppto• . <br />;..... <br />.. •. <br />;Off:•' M�`R�E �o °•.c!' ` -. <br />3V!P FZn <br />43864 v: <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer *''oi�' %pALr������ <br />Trapper Mining, Inc. ►urrnrm ilo <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />5 <br />6 <br />6 <br />Table of Contents <br />1.0 Introduction <br />2.0 Critical <br />Construction Periods <br />2.1 <br />Removal of All Organic Material and Topsoil <br />2.2 <br />Placement of Underdrainage Systems <br />2.3 <br />Installation of Surface Drainage Systems <br />2.4 <br />Placement and Compaction of Fill Materials <br />2.5 <br />Revegetation <br />3.0 References <br />I certify that this report was prepared by me. <br />ppto• . <br />;..... <br />.. •. <br />;Off:•' M�`R�E �o °•.c!' ` -. <br />3V!P FZn <br />43864 v: <br />Tonia Marie Perkins <br />CO PE 43864 <br />Mining Engineer *''oi�' %pALr������ <br />Trapper Mining, Inc. ►urrnrm ilo <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />5 <br />6 <br />6 <br />