My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-03_HYDROLOGY - C1981010
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981010
>
2013-10-03_HYDROLOGY - C1981010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:32:02 PM
Creation date
10/4/2013 9:30:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
HYDROLOGY
Doc Date
10/3/2013
Doc Name
3rd Quarter 2013 Sediment Pond Inspection
From
Trapper Mining Inc
To
DRMS
Permit Index Doc Type
Sediment Pond Inspections
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAPPER MINING INC. <br />October 1, 2013 <br />Mr. Jared Ebert <br />Environmental Protection Specialist RECEIVED <br />Colorado Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 OCT 0 3 Z013 <br />Dear Mr. Ebert: DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />RE: Trapper Mining Inc., Permit C -81 -010 <br />Third Quarter 2013 Sediment Pond Inspections <br />Impoundment inspection results for the Third Quarter of 2013 are enclosed. All impoundment inspections <br />were conducted by a qualified impoundment inspector. Inspections took place on September 19, 20, 24 <br />and 25 of 2013. <br />Maintenance items noted during the inspections were as follows: <br />1. No Name #2 will be cleaned if weather and time allows. <br />2. Johnson #7R will be cleaned if weather and time allows. <br />3. West Pyeatt #1 needs more rock placed in the inlet. <br />4. Rock needs to be placed on the eastside of East Pyeatt #1. <br />5. East Pyeatt #2 needs debris cleared from the spillway. <br />6. Oak #1 will be cleaned if weather and time allows. <br />7. Middle Flume #3 will be cleaned if weather and time allows and the weir needs to be repaired. <br />8. East Middle Flume needs more rock placed in the inlet. <br />9. East Flume needs more rock placed in the inlet. <br />10. Deal Gulch needs more rock placed in the inlet. <br />11. Industrial Waste Pond will be cleaned if weather and time allows. <br />Trapper will address these maintenance items as time and weather permits. <br />Data related to pond capacity is attached. The last column on the table provides an estimate of the <br />remaining capacity in each pond where remaining capacity is defined as the volume remaining after <br />considering the estimated amount of sediment noted during the inspections. <br />Please contact me if you have any questions. <br />Sincerely, <br />477X��o� p�c►p;•...0 <br />Tonia Marie Perkins ; o �e <br />43$64 �; <br />CO PE 43864 _ -0:l'- <br />; • <br />C: F. Luke /EQ file 118.7 %F'• • °�� <br />P.O. Box 187 Craig, Colorado 81626 (970) 824 -4401 <br />
The URL can be used to link to this page
Your browser does not support the video tag.