Laserfiche WebLink
JD -7 Mine — Drainage Design Plan 25 <br />Sub -basin D -17 includes the 0.43 acre southern portion of the existing underground - waste -rock pile (Figure <br />11). Stormwater runoff from sub -basin D -6 flows to the interceptor ditch and the "001 B -A South" <br />retention pond. A curve number of 80 was applied, representing sagebrush with grass understory in poor <br />condition. <br />4149A.130926 Whetstone Associates • <br />