Laserfiche WebLink
MR -77 — Midterm Adequacy Review and Request for Revision <br />Response No. I <br />Page 2 <br />Tab 25; Bonding <br />3) The insertion instructions submitted with MR77 indicates to replace the existing <br />information in Attachment 25 -1 with the bond cost summary sheets. Rule 2.05.4(2)(b) <br />requires that each permit include a detailed estimate of the cost of reclamation of the <br />proposed operations to be covered by the performance bond with supporting calculations <br />for the estimate Given this, in addition to the summary sheets provided, Attachment 25 -1 <br />should also include the CIRCES cost estimate sheets which provides the supporting <br />calculations for the estimate. The Division provided Seneca Coal Company with the <br />CIRCES calculation sheets with the Midterm Review No. 6 document. Please include <br />these sheets in Attachment 25 -1 of Tab 25 of the permit. The Division has a copy of the <br />CIRCES cost estimate sheets so it is unnecessary to submit a copy of these sheets in your <br />adequacy review response letter. <br />Response: A copy of the CIRCES calculation sheets are included for insertion in the <br />BLM /OSMRE/ SCC copies of the permit. <br />Should the Division have questions regarding the information, please contact at (970) 276- <br />5217. <br />Sincerely, <br />G� <br />Roy Karo <br />Reclamation Manager <br />cc: Foster Kirby (OSMRE) <br />Jennifer Maiolo (BLM) <br />