My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-10-01_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-10-01_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:58 PM
Creation date
10/2/2013 8:25:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
10/1/2013
Doc Name
Response to Adequacy
From
CC&V
To
DRMS
Type & Sequence
TR68
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL SPECIFICATIONS <br />2.2 SEAMING AND TESTING EQUIPMENT <br />A. Seaming <br />1. Approved field seaming processes are hot shoe double fusion welding and extrusion welding, <br />when approved by CERTIFYING ENGINEER. Use double fusion welding as primary method <br />of seaming adjacent field panels. <br />2. CONTRACTOR shall maintain on -site a minimum of two spare operable seaming apparatuses. <br />3. Seaming equipment shall not damage the geomembrane. <br />4. CONTRACTOR may use a hot air device ( "Leister ") to temporarily bond geomembrane panels <br />that are to be extrusion welded. <br />5. CONTRACTOR shall use extrusion welding apparatus equipped with gauges giving temperature <br />of preheat and extrudate at nozzle of apparatus. <br />6. Welding rods or beads used for extrusion welding shall have the same physical properties as that <br />used for the resin used in the manufacture of the type of geomembrane that is being installed at the <br />PSES Pipe Rack Liner Extension Project. <br />7. CONTRACTOR shall use fusion welding apparatus which are self - propelled devices equipped <br />with a gauge indicating temperature of heating element, and a gauge indicating the speed of the <br />welding apparatus. <br />B. Vacuum testing (for extrusion seam only) the equipment shall consist of the following: <br />1. Vacuum box assembly consisting of: rigid housing, transparent viewing window, soft neoprene <br />gasket attached to bottom of housing or porthole and valve assembly, and vacuum gauge. <br />2. Pump assembly equipped with pressure controller and pipe connections. <br />3. Rubber pressure /vacuum hose with fittings and connections. <br />4. Bucket of soapy solution. <br />5. Wide paint brush, or other means of applying soapy solution. <br />C. Air pressure testing (for double fusion seam only) the equipment shall consist of the following: <br />1. Air pump (manual or motor driven), equipped with a pressure gauge, capable of generating, <br />sustaining, and measuring pressure between 25 and 30 psi and mounted on a cushion to protect <br />geomembrane. <br />2. Rubber hose with fittings and connections. <br />3. Sharp hollow needle, or other approved pressure feed device. <br />4. An air pressure- monitoring device. <br />PART 3 - EXECUTION <br />U41A11INIM\135 <br />A. CONTRACTOR, on a daily basis, shall certify in writing that the surface on which the geomembrane <br />will be installed is acceptable. It will be the CONTRACTOR'S responsibility to maintain, protect, and <br />if required return, the subgrade in the condition that was originally accepted, prior to geosynthetic <br />deployment until accepted by CC &V, under criteria identified in Section 02200 as per the <br />SPECIFICATIONS. <br />Geomembrane August 28, 2013 <br />02776.1 -8 Revision 0 <br />S \Projects \1550 - CC &V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Specfications\PSES Pipe Rack Liner Extension Specifications \02776 1 Geomembrane docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.