Laserfiche WebLink
TECHNICAL SPECIFICATIONS <br />7. CONTRACTOR shall assist CQA Monitor in obtaining soil samples for CQA testing. Soil Liner <br />Fill sampling shall be scheduled by CQA Monitor with CONTRACTOR to facilitate CQA field <br />testing. <br />8. CONTRACTOR shall maintain Soil Liner Fill stockpile areas in a free - draining condition. The <br />CONTRACTOR will maintain Soil Liner Fill stockpiles and Soil Liner Fill placed within the <br />limits of the valley leach facility to prevent the drying out of the surface. <br />9. CONTRACTOR shall compact corners and other areas inaccessible to driven compaction <br />equipment using hand - operated 500 -pound vibratory plate or vibratory smooth -drum compaction <br />equipment approved by MANAGER and CERTIFYING ENGINEER. <br />10. CONTRACTOR shall trim the surface of the Soil Liner Fill to the design grades shown on the <br />DRAWINGS. <br />11. CONTRACTOR shall roll the surface of the Soil Liner Fill with a smooth drum roller to remove <br />ridges and surface irregularities greater than 0.5 inches in height. CERTIFYING ENGINEER <br />shall determine if surface preparation is sufficient to place geomembrane. On areas with slopes <br />steeper than 3H:1 V, CONTRACTOR shall adopt methods as necessary to obtain the same final <br />surface preparations that would be obtained by the passage of a smooth -drum roller on flat or level <br />ground. Pushing of compaction equipment by tracked equipment shall not be performed. Wheel <br />ruts on the surface of the Soil Liner Fill from grading equipment shall be repaired by <br />CONTRACTOR prior to placement of the geomembrane by rolling the surface as approved by <br />CQA Monitor. <br />12. CONTRACTOR will remove angular protruding rocks greater than 3/4 inches in diameter from <br />the compacted Soil Liner Fill surface. Indentations left in the Soil Liner Fill Surface after removal <br />of the rocks shall be filled with Soil Liner Fill or other suitable fill approved by CQA Monitor, and <br />compacted to achieve final grade. Areas of the Soil Liner Fill surface with concentrated gravelly <br />areas will have suitable fill approved by CQA Monitor placed on top and compacted to achieve <br />final grade. A maximum thickness of 0.5 inches of suitable fill will be placed on the Soil Liner Fill. <br />13. MANAGER and CERTIFYING ENGINEER will identify any areas of significant desiccation, <br />crusting, or erosion of a lift surface. Soil Liner Fill surfaces found to have desiccation cracks <br />greater than 0.25- inches in width or depth, or which exhibit swelling, heaving or other similar <br />conditions shall be replaced or reworked by CONTRACTOR to remove such defects. Desiccation <br />cracks on the Soil Liner Fill surface less than 0.25- inches in width or depth shall be compacted with <br />a smooth drum roller. CONTRACTOR shall take whatever steps necessary to prepare Soil Liner <br />Fill surface to the satisfaction of MANAGER and CERTIFYING ENGINEER, at no additional <br />cost to CC &V. <br />14. CONTRACTOR shall maintain the Soil Liner Fill surface in a condition suitable for Reomembrane <br />installation as specified in these SPECIFICATIONS and in the CQA Plan until the surface is <br />covered. CONTRACTOR shall repair all weather related damage to Soil Liner Fill surfaces or <br />other portions of the Work that have or have not been covered by geomembrane, at no additional <br />cost to CC &V. <br />15. If any moisture is allowed to collect under the geomembrane prior to or after final seaming and <br />softens the Soil Liner Fill, the geomembrane shall be removed and CONTRACTOR shall <br />recondition and recompact the Soil Liner Fill to meet all placement and trimming <br />SPECIFICATIONS, at no additional cost to CC &V. <br />16. CONTRACTOR shall remove all hubs and survey stakes in the Soil Liner Fill and backfill all <br />holes with MANAGER and CERTIFYING ENGINEER approved moisture - conditioned Soil <br />Liner Fill or bentonite. Compact with a Proctor hammer or other suitable device that will achieve a <br />kneading _type of compaction and will achieve the required density. <br />Earthworks September 24, 2013 <br />02200.0.1 -8 Revision 1 <br />S \Projects \1550 - CC &V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 Specificatwns\PSES Pipe Rack Liner Extension SpeaficahonsUnd—dual Specification <br />Sections \02200 0 RI Earthworks docx <br />