TECHNICAL SPECIFICATIONS <br />B. No clearing shall be performed until written permission is given by MANAGER and until the <br />CONTRACTOR has provided construction staking for the proposed work. Clearing shall consist of <br />cutting brush to the ground level, removing such material, along with wood, rubbish, tree stumps, and <br />any other vegetation with roots in excess of 1 -inch diameter, and other deleterious materials, and <br />disposing of all such material in the accepted manner described below. <br />C. In areas designated to be stripped of unsuitable or objectionable material, said materials shall be <br />stripped to the full depth of organic or other unsuitable material as determined by MANAGER and <br />CERTIFYING ENGINEER, whichever is greater. <br />D. Stripped and grubbed vegetation shall be removed and disposed in stockpiles or other approved <br />methods in an area designated by MANAGER. <br />3.2 WASTE REMOVAL <br />A. Waste material is defined as material too wet, too dry, frozen or containing ice or snow, containing <br />organic or other deleterious matter, having poor characteristics of grading or compaction, having other <br />characteristics that may result in undesirable settlement or other movement of the fill, or within the fill, <br />or otherwise not meeting the requirements of the SPECIFICATIONS, provided that this definition <br />permits drying, water, and any other processing or reprocessing to make the material stable and suitable <br />prior to incorporating it into the fill as permitted in the SPECIFICATIONS or by the MANAGER and <br />CERTIFYING ENGINEER. <br />I. CONTRACTOR shall excavate and remove waste in a manner that will minimize contamination <br />with other soil horizons. <br />2. CONTRACTOR shall stockpile removed waste at locations designated by MANAGER. <br />3.3 EXCAVATION <br />A. CONTRACTOR shall perform excavation to the lines and grades shown on the DRAWINGS or as <br />directed by MANAGER. No excavation shall begin until the CONTRACTOR has provided <br />construction staking for the proposed work. <br />B. CONTRACTOR shall prevent the disturbance of surrounding areas during excavation. Where <br />selective excavations are required to obtain materials for Select Structural Fill, the material removed <br />from the excavations shall be taken directly to the fill areas or, if required, stockpiled by material types. <br />The stockpiles shall be approved by MANAGER. <br />C. CONTRACTOR shall grade all excavations to ensure grades are maintained to provide adequate <br />drainage at all times. Work shall be suspended by CONTRACTOR when, in the opinion of <br />MANAGER and CERTIFYING ENGINEER, the site is overly wet, muddy, or otherwise unsuitable <br />for proper maintenance, until directed otherwise by MANAGER, at no cost to CC &V. <br />D. In excavations where Select Structural Fill is to be placed on slopes steeper than 4H:1 V, horizontal <br />benches shall be excavated into the slope to allow fill to be placed in horizontal lifts. The <br />CONTRACTOR shall continuously bench and key embankment material into the existing material a <br />minimum of 2 feet. <br />E. The CONTRACTOR will be responsible for the safety of temporary construction slopes. <br />CONTRACTOR shall inspect all temporary and permanent open -cut excavations on a regular basis for <br />signs of instability. Should signs of instability be noted, CONTRACTOR shall immediately undertake <br />remedial measures and shall notify MANAGER immediately. All slopes shall be left in smooth, safe, <br />and stable condition at the end of the workday. <br />F. CONTRACTOR shall final grade excavations within the Pipe Rack Liner Extension to establish <br />positive drainage to the adjacent storm water collection pond. In no case will depressions or bowls be <br />permitted in the Pipe Rack Liner Extension area. <br />Earthworks September 24, 2013 <br />02200.0.1 -3 Revision 1 <br />S U'rolects \1550 - CC &V Field Spt CQA PSES Bldg \8 0 Project Engineering and Design \8 2 SpecificationsTSES Pipe Rack Liner Extension SpecificahonsUndividual Specification <br />Sections \02200 0 Rl Earthworks doex <br />