Laserfiche WebLink
30 September 2013 <br />Cripple Creek & Victor Gold Mining <br />A Joint Venture - ANGLOGOLD ASHANTI (COLORADO) CORP., Manager <br />Operations Office <br />P.O. Box 191 • 100 North 3rd Street <br />Victor, Colorado 80860 <br />(719) 689 -2977 — Fax (719) 689 -3254 <br />SENT CERTIFED, RETURN RECEIPT REQUESTED <br />7011- 0470 - 0000 - 4833 -8677 <br />Mr. Tim Cazier RECEIVED <br />Environmental Protection Specialist <br />Colorado Department of Natural Resources OCT 01 2013 <br />Division of Reclamation, Mining and Safety <br />Office of Mined Land Reclamation DIVISION OF RECLAMATION <br />1313 Sherman Street, Room 215 MINING AND SAFETY <br />Denver, Colorado 80203 <br />Re: Permit No. M- 1980 -244; Cripple Creek & Victor Gold Mining Company ( "CC &V" ); <br />Cresson Project; — Request for Technical Revision ( "TR 68 ") Extended Process Solution <br />Enhancement ( "PSE ") Liner System Construction — Response to Adequacy <br />Dear Mr. Cazier: <br />CC &V herein provides the response to DRMS Technical Revision TR -68 Preliminary Adequacy <br />Review dated 18 September 2013. <br />The decision date for TR — 68 Preliminary Adequacy Review is October 18, 2013. <br />The following response addresses the individual comments expressed in the DRMS Preliminary <br />Adequacy Review: <br />1) Drawing A110 Sections A through G: <br />a. The sections don't show the extent of the new liner or locate the anchor <br />trenches. Please reference attached Drawing A110 Rev2 for the requested <br />addition of anchor trench and extent of liner information. <br />b. Please provide horizontal stationing on Sections A through G. Please <br />reference attached Drawing A110 Rev2 for the requested horizontal stationing. <br />