In <br />M <br />LT <br />CRIPPLE CREEK & VICTOR GOLD MINING Co. <br />Squaw Gulch (VLF), HWY 67 Realignment Field Monitoring Summary Weekly Report <br />Owner: Cripple Creek & Victor Gold Mining Co. Project Number. Date <br />Project: Squaw Gulch (VLF), Hwy 67 Realignment 74201125N0. * * * *. * * ** 08.31.2013 <br />Location: Cripple Creek & Victor Gold Mine, Colorado <br />Contractor: Ames Construction Co. Inc. <br />Reporting Period: 08.25.13 thru 08.31.13 <br />Days <br />S <br />M <br />T <br />W <br />T <br />F <br />S <br />Work Shifts <br />D <br />D <br />D <br />D <br />D- <br />- <br />N <br />N <br />N <br />N <br />- <br />- <br />D = Day Shift N = Night Shift <br />w = Weather <br />Day <br />Ambient Temperature Ranges for reporting period: Weather conditions for reporting period__ <br />Low: 48 °F - 50°F Cloud Cover: Clear / partly Cloudy / Cloudy <br />High: 72 °F - 79 °F Precipitation: few isolated showers P.M. <br />I Wind: Calm to Gusts at times <br />i <br />Ames: Due to Holiday observance, construction activities were paused following an 8 hr shift on 8.30.13, and no work was <br />performed on 8.31.13. Construction expected to resume on Tuesday 9.3.13. <br />Planning: Continuing Construction activities and scheduling for VLF and HWY 67. <br />CONSTRUCTION ACTIVITIES and PROGRESS: <br />I) Earthworks <br />A) VLF (Phase I) <br />Topsoil / Overburden Stripping: During this reporting period, overburden materials were observed being stripped and <br />placed for later removal near the midway area. In addition, topsoil was hauled to the area #34 stockpile that was located near <br />midway at Approximate Sta. 1-14 +00. <br />Production drilling was performed during this reporting period near design bench "C" from approximate Stations <br />C4 +00 thru C7 +00 right of centerline and at the raven hill area at Approximate Stations A21+00 to A22 +00 In <br />addition drilling around the Phase 11 detention Pond occurred within limits of the VLF. Production drilling is expected <br />to continue. <br />Five production blasts' occurred during this reporting period within planned VLF limits. <br />Structural Fill: The contractor continued fill operations and compaction by method specification for the ADR haul <br />road and the PSSA toe berm. <br />Structural fill materials were hauled from the mine delivered surge pile with several 777 and 740 haul trucks to <br />approximate ADR haul road Sta. 69 +00 - 80 +00. In addition structural fill was placed and compacted at <br />approximate Sta. 49 +00 - 51 +00. A Cat D8T was used to spread the loose lifts and compaction was by utilizing a <br />Cat 563 smooth dram roller. <br />777 and 740 haul trucks hauled structural fill materials to the PSSA toe Berm. A Cat D1 OT was utilized to spread the <br />materials placed. Compaction was achieved by utilizing a Cat CS56B Smooth Drum roller. It should be noted; fill <br />Page 1 of 7 MLE2 WE 08.31.13.doc <br />