Laserfiche WebLink
----------1 <br />11) Storm Water Management <br />NM='AM <br />I I c <br />Best Management Practices (BMP) is being performed. Erosion control efforts took place during this reporting <br />period following any precipitation. <br />CQA ACTIVITIES: <br />1) Field Activities: Observation of construction activities during this reporting period included: <br />topsoil /overburden stripping, production drilling and blasting, Cut to Fill ADR Haul Road (HR), HWY 67 construction, <br />PSSA Toe Berm Fill placement and compaction, MSE wall construction, Underground remediation and clay processing. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density, gradations and material classification and identifications and field material sampling were performed <br />during this reporting period. <br />LVSCF: Sample No's 81 thru 83 were obtained during this reporting period <br />SLF: Sample No. 49 and No. 50 were obtained during this reporting period <br />DCF: Sample No.1 thru 9 were obtained during this reporting period. <br />RBF: Sample No. 3R was obtained and split with CDOT during this reporting period. <br />Class 6: Sample No. 4 and 5 were obtained and split with CDOT during this reporting period. <br />General Project Items <br />Meetings and Discussions: Weekly Project Status meeting was held at 10:00am on September 41h between CC &V, Ames, <br />CDOT and Amec. Topics discussed were Safety, Schedule, Project Issues, concerns and planning. <br />A pre- paving meeting was held between CDOT, Ames, Amec, Yeh and Associates, Schmidt and CC &V on September 5t". <br />Topics discussed were paving plan, any concerns or issues, safety and planning. <br />Summary of Concerns: None <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: None <br />Deliveries: None <br />CQA Monitor <br />Submitted by: Thorne M. Clark Date: 09 07 13 <br />Thorne M Clark <br />Project Resident Manager --'��- <br />Ph: 970.846.9337 <br />Approved By: <br />Date: q - �L5 1:3 <br />Page 4 of 7 MLE2 WE 09.07.13.doc <br />