Laserfiche WebLink
of Colo <br />,.�J *Otf6 COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />; 1313 Sherman Street, Room 215, Denver, Colorado 80203 ph(303) 866 -3567 <br />1a7s <br />REQUEST FOR TECHNICAL REVISION (TR) COVER SHEET <br />File No.: M- 77-424 Site Name <br />County <br />Garfield <br />Logan Wash Mine <br />TR# (DRMS Use only) <br />Perimittee:Occidental Oil Shale, Inc. <br />Operator (If other than Permittee): Western Water & Land, Inc. <br />Permittee Representative <br />George Luxbacher <br />Please provide a brief description of the proposed revision: <br />Realign mine water discharge pipelines in new trench and construct two infiltration trenches for mine <br />water discharge and infiltration on Lower Mine Bench. <br />As defined by the Minerals Rules, a Technical Revision JR) is: "a change in the permit or application <br />which does not have more than a minor effect upon the approved or proposed Reclamation or <br />Environmental Protection Plan." The Division is charged with determining if the revision as submitted <br />meets this definition. If the Division determines that the proposed revision is beyond the scope of a TR, <br />the Division may require the submittal of a permit amendment to make the required or desired changes <br />to the permit. <br />The request for a TR is not considered "filed for review" until the appropriate fee is received by the <br />Division (as listed below by permit type). Please submit the appropriate fee with your request to <br />expedite the review process. After the TR is submitted with the appropriate fee, the Division will <br />determine if it is approvable within 30 days. If the Division requires additional information to approve a <br />TR, you will be notified of specific deficiencies that will need to be addressed. If at the end of the 30 <br />day review period there are still outstanding deficiencies, the Division must deny the TR unless the <br />permittee requests additional time, in writing, to provide the required information. <br />There is no pre - defined format for the submittal of a TR; however, it is up to the permittee to provide <br />sufficient information to the Division to approve the TR request, including updated mining and <br />reclamation plan maps that accurately depict the changes proposed in the requested TR. <br />Required Fees for Technical Revision by Permit Type - Please mark the correct fee and submit it with <br />your request for a Technical Revision. <br />Permit Type Required TR Fee Submitted (mark only one) <br />110c, 111, 112 construction <br />materials, and 112 quarries $216 <br />112 hard rock (not DMO) $175 Recel ,r eb <br />r, <br />110d, 1 12d(1, 2 or 3) $1006 -, (- 7 2013 <br />DI �,1 1 y OF RECLAM <br />P ✓, ,,,`��hPVDS ATION <br />AFETy <br />