Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />September 20, 2013 <br />John DeWitt <br />Lincoln County <br />P.O. Box39 <br />Hugo, CO 80821 <br />STATE OF COLORADO <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E Pineda <br />Director <br />RE: Jamaco Pit; DRMS File No. M- 2010 -082; Receipt of 110 Construction Materials <br />Reclamation Permit Amendment Application Package <br />Dear Mr. DeWitt, <br />On September 10, 2013 the Division of Reclamation, Mining and Safety (Division) received <br />your 110 Construction Materials Reclamation Permit Amendment Application package for the <br />Jamaco Pit, File No. M- 2010 -082. Preliminary review of the information received determined <br />that the following items must be received before the Division can consider your application as <br />being submitted and technical review can begin: <br />Application Form <br />The Certification page, page 8 of the Application Form, was not filled out completely. Please <br />submit a revised copy of the Certification page with the County Clerk signature included. A <br />copy of the Certification page has been enclosed with this letter. <br />2. The Applicant did not provide a signed affidavit that notice of the proposed activity was <br />posted at the mine site as required by Rule 1.6.2(l)(b). A copy of the affidavit has been <br />enclosed with this letter. <br />Your application will not be considered filed until the information listed above is received and <br />found sufficient to begin our review. A decision date will be established 30 days from the date <br />of receipt of all of the requested information. Additionally, if you have already published notice <br />you will need to republish notice, after the Division considers the application submitted. <br />Republication must occur once within ten (10) days of the submittal date. We will notify you <br />when you should initiate republication of your notice. The final date for receiving comments is <br />ten (10) days after the date of publication or the next regular business day. <br />You have sixty (60) days from the above date to submit all necessary documents that the Office <br />needs for an application to be considered filed. If, at the end of the sixty day period, the <br />Office of Office of <br />Mined Land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines <br />