Laserfiche WebLink
Feb. 15, 2013 <br />Stormwater Management Plan (SWMP) <br />For: Deep Creek Placer <br />Located at: 201 Deep Creek Rd (Road 639), Old Town of Lime, San Miguel County <br />Permit No.: COR340962 <br />SWMP Administrator: Dan Collins (Owner /Operator). Dan.collins @asu.edu 480 - 206 -2037 <br />1. Site Map (see attached map with legend addressing pertinent items): <br />a. Mining site boundaries <br />b. Access and haul roads <br />c. Stormwater outfalls and an outline of the drainage area of each stormwater outfall <br />d. An estimate of direction of flow <br />e. Materials handling areas <br />f. Each existing structural control measure to reduce pollutants in the stormwater runoff <br />g. Areas used for storage or disposal of overburden, materials, soils or wastes <br />h. Areas used for mineral milling and processing <br />i. Springs, streams, wetlands and other surface waters <br />j. Location of mine drainage or any other process water <br />k. Boundary of tributary area that is subject to effluent limitations <br />I. Date the map was prepared — Feb. 15, 2013 <br />2. Description of Potential Pollutant Sources /Material Inventory <br />As this is an inactive site that has been carefully maintained, there is very little potential for <br />stormwater contamination. While equipment such as a small backhoe, a pickup truck, and a <br />skip loader are occasionally brought on site for routine site maintenance, there is no active <br />program for equipment repair /fueling /overhaul that pose risks to stormwater runoff. There is a <br />200 gal. tank of biodiesel, stored on an elevated steel framework, stored outside, and well <br />above any active runoff area. Other fuels stored in approved, explosion -proof shed. Outside <br />"equipment apron" adjacent to mine portals has been contoured to direct stormwater runoff to <br />two outflows on site (see attached map). The entire area has been graded with limestone gravel <br />leftover from earlier limestone mining activities. <br />3. Stormwater Quality Controls <br />a. SWMP Administrator— Dan Collins, Owner /Operator. <br />b. Materials Handling and Spill Prevention: As indicated, diesel storage is isolated from areas <br />where surface runoff occurs. Incineration of waste materials collected on site and from <br />immediately adjacent sites is tightly monitored and controlled (notification of local authorities <br />precedes any major incineration event). Fuels (apart from biodiesel tank on stand) are stored in <br />explosion proof steel shed. No toxic materials are stored on site. <br />c. Erosion and Sediment Controls: Currently, stormwater is directed via surface contouring to <br />ditches on the southern and northern edges of the site. On the south side, a small amount of <br />surface runoff is largely absorbed by a very large talus slope leading down to a bermed access <br />road above State Highway 145. No water has been observed flowing downhill as far as the <br />bermed road (a distance of some 200 feet). On the north side, a small amount of surface water <br />1 <br />