My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-30_REVISION - C1981010 (5)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2013-09-30_REVISION - C1981010 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:31:46 PM
Creation date
9/30/2013 11:25:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
9/30/2013
Doc Name
Phase 1 Bond Release Area Delineation Map 1 Sheet 3 of 3
Type & Sequence
SL15
Email Name
JLE
SB1
Media Type
M
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRAPPER MH,IE L-tcq � i -C) I C) CRAIG, CO. <br />PROPOSED PHASE I BOND RELEASE BOUNDARY PERMIT BOUNDARY — — — — — 400 <br />PROFESSdONAL ENGINEER'S CERFflCATRON <br />APPROVED PHASE I BOND RELEASE BOUNDARY RECONSTRUCTED DRAINAGE SL <br />15 PHASE I <br />,j.-Mprie Perkins, a registered Professional Engmeer <br />r collorodo, having reviewed this map end <br />1 if SCALE: 1 M 400 FT <br />information provided by oth erts, PROPOSED PHASE 11 BOND RELEASE BOUNDARY EXISTING STOCK POND <br />0 RECEIVED <br />Iipnal 'tet 9)t"��' <br />'k"�pforrnation is true and cor <br />49 � -rec he <br />and information. CONTOUR INTERVAL: 10 FEET BOND RELEASE <br />-1z <br />I APPROVED PHASE 11 BOND RELtEASE BOUNDARY <br />PENDING PHASE I BOND RELEASE BOUNDARY <br />7—, '>1C <br />177 -q7-771 LI-1 �-1 3 U - <br />0 " %\ " ' 1, " '\ " "' � ° Ay'A P, r ?13 ' �- PROPOSED PHASE OND RELEASE BOUNDARY L---- AREA DELINEATION <br />21 -a: 1'- 43864 <br />io Marie Perkins, CO CPC N1,6. 43864 <br />W 'a <br />• .'44, �� t <br />APPROVED PHASE III BOND RELEASE BOUNDARY ki Division of Reclamation heet 3 <br />Mining & Safety SCALE: I 40D' <br />S' POWERLINE/TOPSOIL HAULAGE/DRAINAGE/ROAD CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Topogrophic information compiled from aeria� photogrophy dcjted 10/15/2012 <br />01 SHEET LOCAfl&N NDEX Minescape Fi�e: M:\Pr-ojects\Einvironmientoil\SL15—phoseI DESIGNED BY: FL, GCR <br />"ONA �*V MAP 1 <br />0 GD-3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY DI,RAWN BY: RDN,RDH <br />DATE: 9/12/2013 SHEET 3 rr�Pp�r Wawa <br />
The URL can be used to link to this page
Your browser does not support the video tag.