Laserfiche WebLink
TRAPPER MH,IE L-tcq � i -C) I C) CRAIG, CO. <br />PROPOSED PHASE I BOND RELEASE BOUNDARY PERMIT BOUNDARY — — — — — 400 <br />PROFESSdONAL ENGINEER'S CER­FflCATRON <br />APPROVED PHASE I BOND RELEASE BOUNDARY RECONSTRUCTED DRAINAGE SL <br />15 PHASE I <br />,j.-Mprie Perkins, a registered Professional Engmeer <br />r collorodo, having reviewed this map end <br />1 if SCALE: 1 M 400 FT <br />information provided by oth erts, PROPOSED PHASE 11 BOND RELEASE BOUNDARY EXISTING STOCK POND <br />0 RECEIVED <br />Iipnal 'tet 9)t"��' <br />'k"�pforrnation is true and cor <br />49 � -rec he <br />and information. CONTOUR INTERVAL: 10 FEET BOND RELEASE <br />-1z <br />I APPROVED PHASE 11 BOND RELtEASE BOUNDARY <br />PENDING PHASE I BOND RELEASE BOUNDARY <br />7—, '>1C <br />177 -q7-771 LI-1 �-1 3 U - <br />0 " %\ " ' 1, " '\ " "' � ° Ay'A P, r ?13 ' �- PROPOSED PHASE OND RELEASE BOUNDARY L---- AREA DELINEATION <br />21 -a: 1'- 43864 <br />io Marie Perkins, CO CPC N1,6. 43864 <br />W 'a <br />• .'44, �� t <br />APPROVED PHASE III BOND RELEASE BOUNDARY ki Division of Reclamation heet 3 <br />Mining & Safety SCALE: I 40D' <br />S' POWERLINE/TOPSOIL HAULAGE/DRAINAGE/ROAD CORRIDORS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY Topogrophic information compiled from aeria� photogrophy dcjted 10/15/2012 <br />01 SHEET LOCAfl&N NDEX Minescape Fi�e: M:\Pr-ojects\Einvironmientoil\SL15—phoseI DESIGNED BY: FL, GCR <br />"ONA �*V MAP 1 <br />0 GD-3 ASH MONITORING WELLS REMOVED FROM PROPOSED PHASE III BOND RELEASE BOUNDARY DI,RAWN BY: RDN,RDH <br />DATE: 9/12/2013 SHEET 3 rr�Pp�r Wawa <br />