Laserfiche WebLink
-4- <br />12. Primary future (Post - minim) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />General Agriculture(GA) <br />✓ Rangeland(RL) Forestry(FR) <br />Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) <br />Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />✓ Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial /Commercial(IC) <br />Developed Water Resources(WR) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />Scrapers, a Dozer and front end loaders remove material and take to plant. <br />15. On Site Processing: ✓ Crushing /Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Processing takes place to build a large inventory of material. The stockpiled <br />material is hauled from the site as needed. The processing plant is moved to a another mine until the stockpiles need replenishing. <br />List any designated chemicals or acid - producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This conversion is to expand the mine by 16.74 acres. It increases the reserves and extends the life of the <br />mine. The mine limits will be expanded on the north, south and west sides so they match the boundary in the <br />Special Use Permit issued by Huerfano County in 2009. Method of operations will remain unchanged <br />Stockpiles will be built and material hauled as needed. <br />