My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-26_REVISION - M2009027
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2009027
>
2013-09-26_REVISION - M2009027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:15 PM
Creation date
9/27/2013 7:52:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2009027
IBM Index Class Name
REVISION
Doc Date
9/26/2013
Doc Name
Conversion Application
From
The Walsenburg Sand and Gravel Company
To
DRMS
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT L <br />RECLAMATION COSTS <br />The following Reclamation Cost estimate is based on the <br />assumption that there will be no more than 25.22 acres ± distur- <br />bance at any -one time. The mine working face will be 900 feet long <br />by 20 feet high and be cut /fill sloped. An addition 400 feet of <br />slope will need to be backfill sloped. When it comes time to <br />resoil the area, an average of 5 inches of soil would be spread <br />over the disturbed area. At that time we will have to respread <br />16,950 cubic yards of topsoil and move 3,330 cy of cut \fill slop- <br />ing. The backfill sloping and shaping on the exterior slopes <br />needing 7,115 cubic yards of material. The table below outlines <br />the various areas of disturbance at the time explained above. A <br />D8N is used to do the shaping and resoiling in this calculation and <br />the mobilization haul distance is 9.25 miles. The revegetation <br />cost figure used includes fertilizer, grass seed, labor and drill- <br />ing costs. <br />STAGE <br />TOTAL <br />SOIL DEPTH <br />NEEDING RESOILING <br />25.22 <br />5 <br />REVEGETATION AREA <br />25.22 <br />7,817.29 <br />RESOIL @ S° <br />1 6,950 <br />CUBIC YARDS <br />CUT /FILL SLOPING <br />3,330 <br />CUBIC YARDS <br />BACKFILL SLOPING <br />7,1 1 5 <br />CUBIC YARDS <br />ESTIMATED UNIT COSTS FOR RECLAMATION ITEMS: <br />Unit Cost <br />1. Revegetation areas includes grass seed, fertilizer <br />and labor to drill $ 500.00 /AC. <br />2. Re- spreading soil and /or growth media with <br />D -8 cat push distance 200 ft or less . . . . . . . . . . . . . $ 0.46/YD' li <br />3. Cut /fill working face 400 feet long by 20 feet high <br />D -8 cat push distance 60 ft or less . . . . . . . . . . . . . . $ 0.19 /YD' 1 <br />4. Backfill and shape 400 feet long by 20 feet high <br />988H Frontend Loader haul distance 900 ft or less . . . . . . . $ 0 .72/YD3 1 <br />5. Shape seedbed 140G Blade at 2.11 acres per hour . . . . . . . . $ 48 .53 /AC li <br />RECLAMATION COSTS <br />1. <br />Revegetation, 25.22 ac @ $500.00 /ac <br />$12,610.00 <br />la. <br />Secondary revegetation 25.22 ac @ 33% * $250.00 /ac <br />2,080.65 <br />2. <br />Resoiling, 16,950 yd @ 46.1 /yd3 <br />7,817.29 <br />3. <br />Cut /fill highwall 3,330 yd @ 194 /yd3 <br />631.74 <br />4. <br />Backfill slope 7,115 yd @ 724/yd3 <br />6,472.11 <br />5. <br />Shape seed bed 25.22 acres @ $48.53/ ac <br />1,223.92 <br />Net Total <br />$30,835.71 <br />6. <br />Indirect costs <br />Mobilization <br />3,423.81 <br />Insurance, Bond, Management& Profit <br />4,030.23 <br />7. <br />Administration costs <br />2,243.30 <br />TOTAL ESTIMATE <br />$40,533.05 <br />Recommend bond be set at $40,500.00 <br />47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.