Laserfiche WebLink
RECLAMATION PLAN <br />EXHIBIT F (CONT.) <br />comply with applicable Colorado water laws and regulations (as <br />the operator understands them) governing injury to existing water <br />rights to minimize any disturbance, which might occur to the <br />prevailing hydrologic balance of the affected land and surround- <br />ing area and to the quality and quantity of water in surface and <br />ground -water systems both during and after the mining operation <br />and during reclamation. The operator expects to comply with <br />applicable Federal and Colorado water quality laws and regula- <br />tions. Any water used in the operation of the processing plants <br />and for dust control will come from water described in WATER - <br />EXHIBIT G. <br />No dredging takes place at this facility, there are no <br />temporary siltation structures involved in this operation and no <br />mining will be done in a river or waters of the United States. A <br />U.S. Army Corps of Engineers Permit is not required for this <br />operation because there are no wetlands on the site. Stormwater <br />retention ponds may be constructed on the site to collect storom- <br />water before it leaves the site. There will be no earthen dams <br />on the mined area. <br />The mining and reclamation plans consider existing wildlife <br />conditions and final reclamation will enhance the area for <br />wildlife use. The mining and reclamation plans allow for the <br />safety and protection of wildlife remaining on the mine site, at <br />the processing site and along all access roads to the site. In <br />general we have found there is little long term disturbance to <br />native wildlife species around gravel mining operations. The big <br />game species tend to use mining sites and newly vegetated areas <br />after operations have stopped for the day. The smaller species <br />tend to move to undisturbed areas. The Colorado Division of <br />Wildlife has noted that there are no threatened or endangered <br />species on the site <br />Topsoil in the area is of good to fair quality, so when it <br />is removed to reach the mineral deposit, it will be segregated <br />and stockpiled. If the topsoil and overburden piles remain <br />undisturbed for more than a year, a vegetative cover of 2 lbs- <br />p1s 1100 FT Western Wheatgrass or other means will be employed to <br />prevent erosion from wind and water and keep them free of contam- <br />inants so that they remain useful for sustaining vegetation when <br />reclamation begins. The stockpiles will be located in areas <br />where disturbances by ongoing mining operations will be at a <br />M. <br />