Laserfiche WebLink
(FORM 2 - Publicfiling) <br />I Dea¢ribe the estimated topsoil depth acrd how topsoil will be salvaged, stockpiled arb Mdioibuted for the re- ""buts anent of <br />ve2fttion. Specify approximate topsoil redistribution depth: <br />9. Describe how drill holes will be plugged (refer to Rulc 5.4 of the Rules for required abaodtrrtnmt ptecedura): <br />10. Describe how portals. adits, shOok ponds, excavations, or other di turbantoes will be reclaimed (refer to Rule 3 sxl Rule 5 for <br />specific reclaotation parformsnce standards). You may wish to contact the Division for cloare speciflaations. <br />11. Describe how roads will be reclaimed or returned to their l "ruspechng (or better) oonditioa: <br />