Laserfiche WebLink
A�v -/�FlUc An epo rt `n R <br />nua <br />Page 2 of 3 <br />Permittee Name: <br />Grand Junction Concrete <br />Pipe Co. <br />Permit Number: <br />M- 2009 -048 <br />Operation Name: <br />Gunnison River Gravel Pits <br />County: <br />Mesa <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />September 28, 2013 <br />Permit Acreage: <br />29.97 <br />Current Bond Amt: <br />$88,767.00 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. <br />Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />ES NO <br />2. <br />Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />(ffDNO <br />3. <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />backfilled: <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />seeded w/ <br />4. <br />What was the date of last excavation, processing or hauling activity at the mine? <br />h1aAl G <br />mulched w/ <br />/Tligc 174s No7c ye- f 46 e,,PG.1 o ,P cra,e.•u •'t <br />5. <br />Does the mine operate more than 180 days per year? <br />YES <br />replaced: <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />approved mulch: <br />6. <br />Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />for INTERMITTENT OPERATION? <br />YES <br />YES <br />Total acres <br />b) approval <br />Topsoil <br />7. <br />Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. <br />Number of acres that were newly affected during the current report year. <br />d <br />D <br />`�G® <br />/V /1-11 <br />9. <br />Number of acres that were reclaimed during the current report yearp -r- <br />10. <br />Estimated new acreage to be affected in the next report year. CR 2 ®13 <br />J- <br />11. <br />Division of Keclamation, <br />Estimated acres to be reclaimed in the next report year. Mining & Safety <br />12. <br />Total acres in various stages of reclamation, since permitted mining activities began: <br />/ <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />I I�� <br />w /topsoil <br />O <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />D <br />replacement <br />/il <br />�T <br />rate (tons /ac): <br />All,- <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />application <br />/ <br />Fertilizer <br />application <br />j(1//� <br />Mulch <br />application <br />method: <br />method: <br />method: <br />