My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-09-17_INSPECTION - M2000080
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2000080
>
2013-09-17_INSPECTION - M2000080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:25:08 PM
Creation date
9/24/2013 6:37:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2000080
IBM Index Class Name
INSPECTION
Doc Date
9/17/2013
Doc Name
Inspection
From
DRMS
To
operator
Inspection Date
8/21/2013
Email Name
TOD
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PERMIT #: M- 2000 -080 <br />INSPECTOR'S INITIALS: TOD <br />INSPECTION DATE: September 21, 2013 <br />OBSERVATIONS <br />This inspection was conducted in response to a request for an acreage release (AR -01) that the Division of <br />Reclamation, Mining and Safety (Division) received on May 10, 2013 and called complete on July 16, 2013. <br />The inspection was conducted by Tyler O'Donnell of the Division. Pioneer Sand Company, Inc., the operator, <br />was represented by Mike Ausburn during the inspection. The Pioneer Farm pit is located approximately 7 <br />miles southeast of Watkins Colorado. The Pioneer Farm pit is permitted as a sand pit. The current permit area <br />is 315.5 acres. AR -01 requests a release of 5.5 acres of land that has an oil and gas facility located on it. The <br />new proposed permit area is 310 acres. The approved post- mining land use is cropland. <br />The Division sent out notices regarding the release request to the owners of record of the affected land, the <br />Arapahoe County Commissioners and to the West Arapahoe Conservation District on July 17, 2013 as required <br />by Construction Materials rule 4.17.2. The Division did not receive any written comments or objections to the <br />release request. On September 16, 2013 the Division approved a technical revision (TR -01) that updates the <br />reclamation plan and the reclamation plan map which included the location of the oil and gas facility. Based <br />on the conditions observed at the site during the inspection, it appears that the operator has complied with <br />the requirements of the Act, Rules, and the approved reclamation plan. The request for an acreage release <br />will be approved, notice of the Division's decision regarding the release will be sent under separate cover. No <br />problems or violations were noted during the inspection. <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.