Laserfiche WebLink
ULLDOZER WORK <br />Task description: APPLY 6 INCHES OF TOP SOIL <br />Permit Action: TR -06 Expand Dist. <br />Site: Fountain Pit Area to 450 ac <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 8/19/2013 County: El Paso <br />User: TC 1 <br />Agency or organization name: DRMS <br />HOURLY EOU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat DI IR - I ISU <br />850 <br />Semi - Universal <br />3 -shank ripper <br />1 per day <br />(CRG) <br />Ownership Cost /Hour: <br />$142.46 <br />Operating Cost/Hour: <br />$285.4_5 <br />Ripper op. Cost/Hour: _ <br />$13.7_6_ <br />Operator Cost/Hour: <br />$38.85 <br />Total unit Cost/Hour: $480.52 <br />Total Fleet Cost/Hour: $961.03 <br />Utilization % <br />_ NA <br />1_00 <br />100 <br />NA <br />MATERIAL QUANTITIES <br />Initial Volume: <br />242,000 <br />Swell factor: <br />1.429 <br />Loose volume: <br />345,721 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly production: 2,800.0 LCY /hr <br />Materials consistency description: Partly consolidated stockpile 1.1 <br />Average push gradient: -5% <br />Average site altitude: 5,600 feet <br />Material weight: 1,6001bs /LCY <br />Weight description: Top Soil <br />Job Condition Correction Factor Source <br />Operator Skill: _ 0.750 _ (AVG.) <br />Material consistency: 1.100 (CAT HB <br />Page 1 of 2 <br />Permit/Job #: M1981307 <br />Abbreviation: None _ <br />Filename: M307 -003 <br />CIRCES Cost Estimating Software <br />