Laserfiche WebLink
Page 1 of 2 <br />BULLDOZER WORK <br />Task description: RIP PIT FLOOR <br />Permit Action: TR -06 Expand Dist. <br />Site: Fountain Pit Area to 450 ac Permit/Job #: M1981307 <br />PROJECT IDENTIFICATION <br />Task #: 002 State: Colorado__ Abbreviation: None <br />Date: 8/19/2013 County: El Paso Filename: M3.07 -002 <br />User: TC 1 <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat DIOT - IOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Utilization % <br />Ownership Cost/Hour: $110.73 } NA <br />Operating Cost/Hour: $187.89 - 100 <br />Ripper op. Cost/Hour: $10.88 100 <br />Operator Cost/Hour: $38.85 NA <br />Total unit Cost/Hour: $348.35 <br />Total Fleet Cost/Hour: $696.70 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />703,413 <br />Swell factor: <br />1.250 <br />Loose volume: <br />879,266 LCY <br />Source of estimated <br />volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />100 feet <br />1,718.9 LCY /hr <br />Loose-stockpile-1.2- <br />Average site altitude: 6,500 feet <br />Material weight: 2,6501bs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 1 (AVG.) <br />Material consistency: 1.200 (CAT HB) <br />CIRCES Cost Estimating Software <br />