Laserfiche WebLink
COST SUMMARY WORK <br />Task description: - Cost Summary to increase disturbed area by 150 acres (add to current bond) <br />Permit Action: TR -06 Expand <br />Dist. Area to 450 <br />Site: Fountain Pit ac Permit /Job #: M1981307 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 8/19/2013 County: El Paso Filename: __ M_30.7 -0.00 _ ___ _ <br />User: TC 1 <br />- - - - - -- - - -- <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />_ <br />Description <br />Form <br />Used <br />Fleet <br />Task <br />! Hours <br />Cost <br />001 <br />002 <br />003 <br />004 <br />005 <br />BACK FILL AND GRADING TO 3:1 SLOPE <br />DOZER <br />__Size <br />2 <br />360.66 <br />$251,268.32 <br />$228,214.07 <br />$50,038.20 <br />$44,173.35 <br />$1,082.66 <br />RIP PIT FLOOR <br />DOZER <br />2 <br />327.57 <br />APPLY 6 INCHES OF TOP SOIL <br />DOZER 2 <br />52.07 <br />REVEG 150 ACRES REVEGE 1 <br />MOB. DEMOB MOBILIZE 1 <br />0.00 <br />0.22 <br />SUBTOTALS: <br />740.52 <br />$574,776.60 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />0.00 <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT <br />$11,610.49 <br />$6,035.15 <br />$0.00 <br />$57,477.66 <br />$75,123.30 <br />$649,899.90 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and /or contract/bid preparation: <br />0.00% <br />Total = <br />$0.00 <br />Reclamation management and /or administration: <br />0.00% <br />$0.00 <br />CONTINGENCY: <br />3.00 <br />Total = <br />$17,243.30 <br />TOTAL INDIRECT COST = <br />$92,366.60 <br />TOTAL BOND AMOUNT (direct + indirect) = <br />$667,143.20 <br />