Laserfiche WebLink
Mobilization Worksheet Cont'd Task # 005 Page 2 of 2 <br />EOUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: <br />Total one -way travel distance: <br />Average Travel Speed: <br />Total Non - Roadable Mob/Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Transportation Cycle Time: <br />JOB TIME AND COST <br />FOUNTAIN - - <br />2.00 miles <br />35.00 mph <br />$1,082.66 <br />$0.00 <br />Totaljob time: 0.23 Hours <br />Total job cost: $1,082.66 <br />C[RCES Cost Estimating Software <br />Non - Roadable <br />Roadable <br />Equipment <br />_ <br />_Equipment <br />Haul Time (Hours): <br />0.06 _ <br />0.06 <br />Return Time (Hours): <br />0.06 <br />0.06 <br />Loading Time (Hours): <br />0.00 <br />_ <br />NA <br />Unloading Time (Hours): <br />0.00 <br />NA <br />Subtotals: <br />_ <br />0.11 <br />0.11 <br />JOB TIME AND COST <br />FOUNTAIN - - <br />2.00 miles <br />35.00 mph <br />$1,082.66 <br />$0.00 <br />Totaljob time: 0.23 Hours <br />Total job cost: $1,082.66 <br />C[RCES Cost Estimating Software <br />