Laserfiche WebLink
Task description: Finish <br />Site: Sharp Gravel Pit <br />PROJECT IDENTIFICATIOl\ <br />Task #: 103 <br />Date: 9/19/2013 <br />User: TOD <br />MOTOR GRADER WORK <br />Permit Action: Surety Reduction <br />State: Colorado <br />County: Bent <br />Agency or organization name: DRMS <br />[11,7AWX111110ioleo K4111,11 <br />Permit/Job #: M2012036 <br />Abbreviation: None <br />Filename: M036 -103 <br />Basic Machine: CAT 16M <br />Horsepower: 297 <br />Ripper Attachment: Multi -Shank Ripper <br />Shift Basis: 1 per day <br />HOURLY PRODUCTION <br />Data Source: (CRG) <br />Cost Breakdown: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0 -2.5 mph) - 1.5 <br />Utilization % <br />Ownership Cost/Hour: <br />$66.45 <br />NA <br />Operating Cost/Hour: <br />$90.35 <br />100 <br />Ripper Operating Cost/Hour: <br />$3.30 <br />100 <br />Operator Cost/Hour: <br />$27.55 <br />NA <br />Total Unit Cost/Hour: <br />$187.65 <br />Job Condition Correction Factors <br />Total Fleet Cost/Hour: $187.65 <br />MATERIAL OUANTITIES <br />Total Area to be graded or ripped: 27.00 <br />acres <br />Source of estimated acreage: From TR -0 1 <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />1.50 <br />mph <br />Selected Application: <br />Finish grading (0 -2.5 mph) - 1.5 <br />Selected Blade Angle: <br />30 <br />degrees <br />Effective Blade Length: <br />13.90 <br />feet <br />Width of blade overlap per pass: <br />2.00 <br />feet <br />Net grading or ripping width per pass: <br />11.90 <br />feet <br />Unadjusted Hourly Unit Production: <br />2.1636 <br />acres /hour <br />Job Condition Correction Factors <br />Site Altitude: 3900 feet <br />Source <br />Altitude Adj: 1.00 <br />(CAT HB) <br />Job Efficiency: 0.85 <br />(1sh/d, mod.) <br />Net Correction: 0.8500 multiplier <br />Adjusted Hourly Unit Production: <br />1.8391 <br />acres /Hour <br />Adjusted Hourly Fleet Production: <br />1.8391 <br />acres /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Total job time: <br />14.68 Hours <br />Unit cost: $102.03 per acre <br />Total job cost: <br />$2,755.00 <br />CIRCES Cost Estimating Software <br />