Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 101 Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 <br />(AVG.) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(SSD -AC) <br />1.426 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />(PAT) <br />Net correction: 0.6102 <br />Adjusted unit production: 533.68 LCY /hr <br />Adjusted fleet production: 1067.36 LCY /hr <br />JOB TIME AND COST <br />Fleet size: 2 Dozer(s) <br />Unit cost: $0.395/LCY <br />Total job time: <br />Total job cost: <br />38.41 Hours <br />11.17 <br />CIRCES Cost Estimating Software <br />